SPARK - Waste Water Connection to MODON

Start: August 2019 | Finish: October 2020
Status: Completed

Location:

King Salman Energy Park, Saudi Arabia

Contract Type:

Client:

Saudi Aramco

https://www.aramco.com/

Client Consultant:

Design Consultant:

Project Description:

The project objective is to develop Main Sewer Pumping Station‭, ‬Retention Pond and pipeline works to connect Treated Sewer Effluent Pumping Station at MODON‭.

Work Include:

•‭ ‬Main Sewer pump station for sewer discharge volume generated at SPARK phase 1‭.
‬ •‭ ‬Sewer force main from MSPS to MODON industrial zone for discharge or raw ser to MODON WWTP‭.
‬ •‭ ‬TSE water transfer pump station inside MODON industrial zone and TSE force main from MODON industrial zone to SPARK irrigation‭ ‬storage tank‭.‬
•‭ ‬Interfaces and connections with existing services including power supply connections‭.‬

What our clients say about us?

• Good planning, coordination and execution of activities, work processes and critical operation. Good effort made to keep on schedule.
• Excellent management structure and reporting procedure.
• HSE representative has good knowledge and experience. Performance was above the acceptable standard.
Conclusion: General Performance exceeds expectations.

Dr. Engr. Salah Attia Abdelzaher

Director Projects JODC (Director of infrastructure and MEP)

Jabal Omar Development Company

Impressed with the project team’s expertise and hands on experience with road projects.

They have consistently delivered against project objectives and proved as most reliable construction partner.




Khaled El Kholy

Project Engineer

Umm Al Qura for Development & Construction

Always delighted to work with Shade team; our trusted EPC partner.

Their proactive approach has added value to each stage of the development and we have always been able to rely on their team to provide a very high quality, cost effective and robust results.



Ahmed Basiony

Project Manager

Nesma & Partners

The staff employed by Shade for the project, have supported us to deliver a challenging scheme on time, budget, quality and specification, which has resulted in us keeping promise of delivering key infrastructure for Makkah on time & budget.





Mostafa Sayed

Project Manager

Jabal Omar Development Authority

To have qualified construction partner as Shade, is key for the success of the project, especially something as complicated as Bridge road E.

Their competent site team supported us in execution as well as their planning process contribute to on time delivery



Amro Khatab

Project Manager

Khatib & Alami

  • Share:

Want to start new project?

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nunc finibus nisl cursus, consequat felis non, lobortis velit. Vestibulum purus nisl, vehicula vitae nulla non, vulputate eleifend nulla. In hendrerit convallis lobortis.

CONTACT US
SHADE CORPORATION LTD.

P.O. Box 7027 Dammam 31462 Saudi Arabia Building No. 5222 Ad Dammam 32414-6124.